|
Point to point measurement 1226mm, 3 Column radiator 26 sections wide, Brackets and 12 inch air vent included. Screw fixings are not included., For further information on the support foot, refer to quotAcova Optional Support Feetquot, Total projection from wall 123mm min, 128mm max. Wall to centre of connections 73 or 78mm., Connection position BOE Bottom Opposite Ends. For correct circulation,the water MUST enter the radiator diagonally opposite the air vent., Pipe centres are dependent on valves used, Valves are not included, It is advised that, if pre piping is necessary, allowances are made to accommodate manufacturing tolerances., Manufacturing tolerance of 0.6mm per section, All outputs are stated to 50dt in line with European EN442 testing standards, A low water content radiator, giving fast, efficient heating, On installation of a new radiator, the entire central heating system should be flushed., 5 years, terms and conditions apply, It should also be chemically cleaned and an inhibitor used that is suitable for a mixed metal system.
|